Here you’ll find all the documents relating to the various stages of the project.
Application Documents – March 2023
Supporting Documents
- Torrance WF Ext 2_Non Technical Summary
- Torrance WF Ext 2 Planning Statement
- Torrance WF Ext 2 Planning Design & Access Statement
- Torrance Ext 2 PAC Report
- Appendix 1 Proposal of Application Notice
- Appendix 2 Online Consultation Pages
- Appendix 3a Torrance CODs social media
- Appendix 3b COD Media Adverts
- Appendix 4a Open Day Panels August 22
- Appendix 4b Open Day Panels Nov 22 v2
- Appendix 4c General Questionnaire
- Appendix 5 COD Posters
- Appendix 6 COD Photos
- Appendix 7 online traffic report 1 Aug to 1 Dec 2022
- Appendix 8 Torrance VYOs combined redacted
- Appendix 9 SP=EED Practical Guide to Engagement in Planning
Volume 1 – Written Statement
- Volume_1 Front Cover and ToC
- Vol1 Chp1_Introduction
- Vol1 Chp2_SiteSelectionDesign
- Vol1 Chp3_DescriptionOfProposedDevelopment
- Vol1 Chp4_EIAMethodology
- Vol1 Chp5_Policy Context
- Vol1 Chp6_LVIA
- Vol1 Chp7_Noise
- Vol1 Chp8_Forestry
- Vol1 Chp9__Traffic and Transport
- Vol1 Chp10_Ecologypdf
- Vol1 Chp11_Ornithology
- Vol1 Chp12_Cultural Heritage
- Vol1 Chp13_Geology and Peat
- Vol1 Chp14_HydrologyHydrogeology
- Vol1 Chp15_Socioeconomics
- Vol1 Chp16_ClimateChangepdf
- Vol1 Chp17_Other_Issues
Volume 2 – Figures
- Torrance – Vol 2 – front cover
- Fig1.2 Site Layout Plan
- Fig1.1 Site Location
- Fig 2.1a Scoping Layout
- Fig 2.1b Interim Layout
- Fig 2.1c Chilled Layout
- Fig 2.1d Frozen Layout
- Fig 3.1 Site Layout Fig
- 3.2 Indicative Turbine Elevation
- Fig 3.3 Indicative Foundation Design
- Fig 3.4 Indicative Crane Hardstanding
- Fig 3.5 Indicative Culvert Detail
- Fig 3.6 Indicative Construction Compound
- Fig 3.7 Substation Compound
- Fig 3.8 Indicative Cable Trench
- Fig 3.9 Proposed Watercourse Crossings
- Fig6.1 LVIA Study Area
- Fig6.2 Blade Tip ZTV – A3
- Fig6.3 Blade Tip ZTV – A0
- Fig6.4 Hub Height ZTV – A3
- Fig6.5 Hub Height ZTV – A0
- Fig6.6 Detailed Comparative ZTV
- Fig6.7 NatureScot Landscape Character Types
- Fig6.8 NatureScot Landscape Character Types with ZTV
- Fig6.9 Local Landscape Character Areas
- Fig6.10 Local Landscape Character Areas with ZTV
- Fig6.11 Topography
- Fig6.12 Local Site Context
- Fig6.13 Landscape Designations
- Fig6.14 Recreational & Transport Routes
- Fig6.15 Residential Properties, Settlements & PROW
- Fig6.16 Cumulative Baseline – 60km
- Fig6.17 Cumulative Baseline – 25km
- Fig6.18 Cumulative ZTV – Operational (Torrance and Southrigg)
- Fig6.19 Cumulative ZTV – Operational (West Benhar)
- Fig6.20 Cumulative ZTV – Operational (Burnhead and Drumduff)
- Fig6.21 Cumulative ZTV – Operational (10km)
- Fig6.22 Cumulative ZTV – Consented (Southrigg 2 and Drumelzie)
- Fig6.23 Cumulative ZTV – Consented (Forrestfield and Brownhill Farm)
- Fig6.24 Cumulative ZTV – Consented (10km – North)
- Fig6.25 Cumulative ZTV – Consented (10km – South)
- Fig6.26 Cumulative ZTV – Application
- Fig7.1 Construction Noise Assessment
- Fig7.2 Assessed Cumulative Developments
- Fig7.3 Operational Noise
- Torrance 2 Forestry 8.1
- Fig 9.1 Abnormal Load Route to Site
- Fig 9.2a General Construction Traffic Route to Site
- Fig 9.2b General Construction Traffic Route (Via M8 Services) to Site
- Fig 9.3 Traffic Count Locations
- Fig 9.4 Road Traffic Collision (RTC) Assessment
- Fig 9.5 VisSplay
- Fig10.1 Phase One Habitat Survey Results
- Fig10.2 NVC Habitat Survey Results
- Fig10.3 Statutory Designated Sites
- Fig10.4 Non-Statutory Designated Sites
- Fig10.5 Protected Species Survey Results
- Fig10.6 Bat Survey Area and RSSLs
- Fig10.7 Fisheries Habitat Survey Locations
- Fig10.8 oHMP Indicative Management Areas
- Fig10.9 Confidential Badger Survey Results
- Fig11.1 Site Boundary and Infrastructure
- Fig11.2 Vantage Points and Viewsheds
- Fig11.3 Ornithology Survey Areas
- Fig11.4 Breeding Bird Territories
- Fig13.1 Site Layout
- Fig13.2 Superficial Geology
- Fig13.3 Bedrock Geology
- Fig13.4 National Soils of Scotland
- Fig13.5 Extract from Carbon and Peat Map 2016
- Fig13.6 Interpolated Peat Depths
- Fig 14.1 Hydrology Study Areas
- Fig 14.2 Hydrological Catchments
- Fig 14.3 Watercourse Crossings
- Fig 14.4 Groundwater Dependent Terrestrial Ecosystems
- Fig 15.1 Recreational and Core Paths
- Fig 17.1 Shadow Flicker
- Fig 17.2 Cumulative Shadow Flicker
Volume 3 – Landscape and Visual Impact and Cultural Heritage Figures
- Torrance – Vol 3 – front cover
- CHVP Cumulative Wirelines_lo-res Spreads
- 3959 Torrance Wind Farm Extn II_EIAR Figures NatureScot CHVP Cumulative Wirelines_lo-res Spreads
- 3959 Torrance Wind Farm Extn II_EIAR Figures NatureScot CHVP Cumulative Wirelines_lo-res Spreads
- 3959 Torrance Wind Farm Extn II_EIAR Figures NatureScot Cumulative Wirelines_PHOMs_v2_lo-res Spreads
- 3959 Torrance Wind Farm Extn II_RVAA Wireline Figures_v1_Low Res
- Cumulative Wirelines_PHOMS_VP1_Lo-res
- Cumulative Wirelines_PHOMS_VP2_Lo-res
- Cumulative Wirelines_PHOMS_VP3_Lo-res
- Cumulative Wirelines_PHOMS_VP4_Lo-res
- Cumulative Wirelines_PHOMS_VP5_Lo-res
- Cumulative Wirelines_PHOMS_VP6_Lo-res
- Cumulative Wirelines_PHOMS_VP7_Lo-res
- Cumulative Wirelines_PHOMS_VP8_Lo-res
- Cumulative Wirelines_PHOMS_VP9_Lo-res
- Cumulative Wirelines_PHOMS_VP10_Lo-res
- Cumulative Wirelines_PHOMS_VP11_Lo-res
- Cumulative Wirelines_PHOMS_VP12_Lo-res
- Cumulative Wirelines_PHOMS_VP13_Lo-res
- Cumulative Wirelines_PHOMS_VP14_Lo-res
- Cumulative Wirelines_PHOMS_VP15_Lo-res
- Cumulative Wirelines_PHOMS_VP16_Lo-res
- Cumulative Wirelines_PHOMS_VP17_Lo-res
- Cumulative Wirelines_PHOMS_VP18_Lo-res
- Cumulative Wirelines_PHOMS_VP19_Lo-res
- Cumulative Wirelines_PHOMS_VP20_Lo-res
- Cumulative Wirelines_PHOMS_VP21_Lo-res
- Cumulative Wirelines_PHOMS_VP22_Lo-res
- RVAA Wirelines R1-R9
- RVAA Wirelines R10-R22
Volume 4 – Appendices
- Torrance – Vol 4 – front cover
- TA2.1 Scoping Report
- TA2.2 Scoping Opinion
- TA6A_Methodology
- TA6B_Landscape Character Baseline
- TA6C_RVAA
- TA6D_LVIA Summary Assessment Table
- TA6E_LVIA Cumulative Baseline Table
- Appendix 7.1 Cumulative Sound Power Levels
- Appendix 7.2 Baseline Noise Survey Records
- Appendix 7.3 Details of Construction Plant
- TA 8.1 Photographic Records
- TA9.1_ALRA
- TA9.2_Traffic Count Data
- TA 9.3_Construction Development Programme
- TA10.1_Habitat Survey Report
- TA10.2_Protected Species Surveys
- TA10.3_Bats
- TA10.4_Fish Habitat Survey
- TA10.5_oHMP
- TA11.1_Baseline_Ornithology Report 2020-21
- TA11.3 Collision Risk Modelling
- TA12.1_DBA (with figs)
- TA12.2_Sieving Exercise
- 3959-REP-109 Fig12.3.1 Designated Assets within 5km
- TA12.4_Assessment_of_Indirect_Effects_Between_5-15km_COMPRESSED
- Figures 12.4.1 and 12.4.1a
- Figures 12.4.1b and 12.4.1c
- Figures 12.4.1d and 12.4.2
- TA13.1 Geology Mining and Geotechnical Report FINAL reduced file
- TA14.1_WCEMP
- 3959_TA16.1_V1-0_CM_20230221
- TA17.1 Shadow Flicker Results Table
- TA17.2_Aviation Risk Assessment
Community Open Day Information – November 2022
- Welcome
- Proposed development
- Proposed layout
- Environmental Impact Assessment
- surveys
- Landscape and Visual Impact Assessment
- Photomontage 1
- Photomontage 2
- Community
- Next steps
Proposal of Application Notice